BLD-Final | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PASS |
Dave Hannah
|
|
|
danielle; Phone #: ###-#### xt 4 Internet Inspection Request from: Letitia Mesa ok for perm occ
|
BLD-Final | 6/6/2005 | 6/8/2005 | 6/8/2005 | P | NR |
Dave Hannah
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIRE-Final Inspection | 6/6/2005 | 6/8/2005 | 6/8/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Framing/Rough-in | 6/1/2005 | 6/2/2005 | 6/2/2005 | A | PART |
Dave Hannah
|
|
|
ceiling grid inspection please///john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover after allother trades have signed off
|
BLD-Framing/Rough-in | 5/25/2005 | 5/25/2005 | 5/26/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/25/2005 at 10:03:54 AM. Contact: ###-####.wall at back and sides of one hr hood ok to cover after elec r/i
|
BLD-Conference | 4/27/2005 | 4/28/2005 | 4/28/2005 | A | PASS |
Dave Hannah
|
|
|
greg allan or cell ####-####; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa changes are miner mostly mec told arc to contact mec inspector
|