BLD-Final | 6/20/2006 | 6/21/2006 | 6/21/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/20/2006 at 3:21:05 PM. Contact: ###-####.
|
DOC - Permit Finaled | 6/21/2006 | 6/21/2006 | 6/21/2006 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 6/8/2006 | 6/9/2006 | 6/9/2006 | A | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory, existing door knobs at two locations to be changed to lever hardware prior to structural final, verified by inspector.
|
FIRE-Final Inspection | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | DEFR |
Forrest France
|
|
|
Inspection to be completed 6/9
|
BLD-Final | 6/5/2006 | 6/6/2006 | 6/7/2006 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/5/2006 at 9:47:47 AM. Contact: ###-####. needs fire life saftey sign off
|
BLD-Framing/Rough-in | 2/15/2006 | 2/15/2006 | 2/16/2006 | P | PASS |
Dave Hannah
|
|
|
Rock -- for shaft; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong shaft fire stopped ok to cover
|
BLD-Other | 2/13/2006 | 2/14/2006 | 2/15/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/13/2006 at 5:57:27 PM. Contact: ###-####. ceiling grid ok
|
BLD-Other | 2/9/2006 | 2/10/2006 | 2/10/2006 | A | FAIL |
Dave Hannah
|
|
|
acoustical grid ceiling//brock nelson; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa wires not 1 in 6 track locked in missing wires ect
|
BLD-Framing/Rough-in | 11/17/2005 | 11/18/2005 | 11/18/2005 | A | PART |
Jim Storey
|
|
|
ceiling grid inspection//rock; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ceilling ok no ele permit atched to group and no insp. activity on permit # they gave me.
|
BLD-Framing/Rough-in | 8/30/2005 | 8/31/2005 | 8/31/2005 | A | PART |
Dave Hannah
|
|
|
Rock Self; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa rest room area ok to cover
|
BLD-Framing/Rough-in | 7/25/2005 | 7/25/2005 | 7/25/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/25/2005 at 7:29:34 AM. Contact: ###-####. first part ok this project is in phases
|
BLD-Framing/Rough-in | 7/20/2005 | 7/22/2005 | 7/22/2005 | A | CANC |
Jim Storey
|
|
|
dan wilson; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|