BLD-Final | 3/8/2006 | 3/9/2006 | 3/9/2006 | A | PASS |
Dave Hannah
|
|
|
tony-- call 1st before insp for access ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm occ
|
Permanent Occupancy | | 3/9/2006 | 3/9/2006 | | DONE |
|
|
|
|
BLD-Final | 2/24/2006 | 2/27/2006 | 2/28/2006 | P | PART |
Dave Hannah
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for temp occ needs to finsh ada items on restroom
|
FIRE-Final Inspection | 2/24/2006 | 2/27/2006 | 2/27/2006 | A | PASS |
Forrest France
|
|
|
c/n items are complete, life safety finaled.
|
FIRE-Final Inspection | 2/22/2006 | 2/22/2006 | 2/22/2006 | P | FAIL |
Forrest France
|
|
|
A fire extinguisher has been installed as requested by previous inspection, hardware at the center door must meet requirements of IFC 2003 per plan review notes. Life safety final is acceptable pending resolution of hardware issues at the center door as discussed.
|
FIRE-Final Inspection | 2/7/2006 | 2/8/2006 | 2/8/2006 | A | FAIL |
Troy Cobbley
|
|
|
Mount the fire extinguisher and provide approved door hardware per the approved plans for the two doors that are not the main exit
|
BLD-Final | 2/6/2006 | 2/7/2006 | 2/7/2006 | A | NR |
Dave Hannah
|
|
|
tony -###-#### needs fire l/f sign off
|
BLD-Final | 7/27/2005 | 7/28/2005 | 7/28/2005 | A | NR |
Dave Hannah
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 7/28/2005 | 7/28/2005 | 7/28/2005 | P | PASS |
Dave Hannah
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|