BLD-Final | 12/15/2006 | 12/15/2006 | 12/15/2006 | P | PART |
Tom Arcoraci
|
|
|
derrick ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp occ 1st floor only at this time
|
FIRE-Final Inspection | 12/14/2006 | 12/14/2006 | 12/14/2006 | P | PASS |
Forrest France
|
|
|
Items on previous c/n have been completed, life safety inspection passed.
|
BLD-Framing/Rough-in | 7/20/2006 | 7/21/2006 | 7/21/2006 | A | PASS |
Tom Arcoraci
|
|
|
derek; Phone #: ###-#### Internet Inspection Request from: Letitia Gallop
|
BLD-Framing/Rough-in | 7/18/2006 | 7/18/2006 | 7/18/2006 | P | PASS |
Jim Sly
|
|
|
darek; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
|
BLD-Foundation | 3/8/2006 | 3/9/2006 | 3/9/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/8/2006 at 1:46:20 PM. Contact: ###-####.
|
BLD-Other | 3/7/2006 | 3/8/2006 | 3/8/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/7/2006 at 3:02:46 PM. Contact: ###-####. ok to install lid at drops 1st floor
|
BLD-Foundation | 2/28/2006 | 3/1/2006 | 3/1/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/28/2006 at 12:04:38 PM. Contact: ###-####.
|
BLD-Footing | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/23/2006 at 9:36:23 AM. Contact: ###-####.
|
BLD-Foundation | 10/27/2005 | 10/27/2005 | 10/27/2005 | P | PASS |
Tom Arcoraci
|
|
|
slab insp//derek cooper; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|