BLD-Final | 1/19/2006 | 1/19/2006 | 1/19/2006 | P | PASS |
Dave Hannah
|
|
|
Kevin with Valley Builders; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
DOC - Permit Finaled | 1/19/2006 | 1/19/2006 | 1/19/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Wall cover | 11/10/2005 | 11/10/2005 | 11/14/2005 | P | PASS |
Dave Hannah
|
|
|
rob; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Wall cover | 11/9/2005 | 11/10/2005 | 11/14/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/9/2005 at 6:39:04 PM. Contact: ###-####. insulation ok c/n items ok
|
BLD-Framing/Rough-in | 11/3/2005 | 11/4/2005 | 11/4/2005 | A | FAIL |
Mike Jordan
|
|
|
kevin Note: to cover walls; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs to complete air seal package proir to insulating. Fire blocking needed at fireplaces, and at 1hr fire wall upstairs. Needs to complete lateral bracing on trusses. Straps also needed at top plates were gas piping passes. c/n posted.
|
BLD-Footing | 8/29/2005 | 8/29/2005 | 8/29/2005 | P | PASS |
Dave Hannah
|
|
|
jerry; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 7/12/2005 | 7/13/2005 | 7/13/2005 | P | PASS |
Dave Hannah
|
|
|
pour at 3:00///shawna; Phone #: ###-#### Internet Inspection Request from: Barbara Moore set backs ok as per city appr plans
|
BLD-Footing | 6/21/2005 | 6/22/2005 | 6/22/2005 | A | CANC |
Dave Hannah
|
|
|
11 ??? --shawna; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie shawn canc
|