BLD-Final | 11/28/2005 | 11/29/2005 | 11/29/2005 | P | PASS |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
|
Permanent Occupancy | | 11/29/2005 | 11/29/2005 | | DONE |
|
|
|
|
BLD-Final | 10/26/2005 | 10/27/2005 | 10/27/2005 | P | FAIL |
Mike Jordan
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Temp occ given. Locks on doors to balcony must be replaced with code compliant type lock for B occ.
|
FIRE-Final Inspection | 10/26/2005 | 10/27/2005 | 10/27/2005 | A | PASS |
Forrest France
|
|
|
Items on correction notice have been amended, fire life safety passed inspection.
|
FIRE-Final Inspection | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | FAIL |
Forrest France
|
|
|
Provide identification for the fire extinguisher cabinets, repair main entry exit sign, provide tenant suite address, verify hardware at the main entry/exit doors when installed, patio door hardware is key operated on both sides.
|
BLD-Framing/Rough-in | 9/28/2005 | 9/29/2005 | 9/29/2005 | A | PART |
Dave Hannah
|
|
|
jim Note: ceiling grid; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceiling grid ok to cover
|
BLD-Conference | 9/13/2005 | 9/13/2005 | 9/13/2005 | P | PART |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ceiling grid no rivits no 3/8 wall angle
|
BLD-Framing/Rough-in | 8/22/2005 | 8/22/2005 | 8/22/2005 | P | PART |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore hard led friming ok to cover
|
BLD-Framing/Rough-in | 8/1/2005 | 8/2/2005 | 8/2/2005 | A | PART |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa walls ok pending trades
|