BLD-Final | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | PASS |
Dave Hannah
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
|
Permanent Occupancy | | 7/27/2005 | 7/27/2005 | | DONE |
|
|
|
|
BLD-Final | 7/6/2005 | 7/7/2005 | 7/7/2005 | A | PART |
Dave Hannah
|
|
|
odie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa c/n on site ok for temp occ
|
FIRE-Final Inspection | 7/6/2005 | 7/7/2005 | 7/7/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 7/6/2005 | 7/6/2005 | 7/6/2005 | P | FAIL |
Forrest France
|
|
|
Provide testing and verification of emergency lights installed as shown in locations on approved plans.
|
FIRE-Alarm Testing | 7/6/2005 | 7/6/2005 | 7/6/2005 | P | CANC |
Forrest France
|
|
|
Duplicate inspection for life safety.
|
FIRE-Conference | 7/6/2005 | 7/6/2005 | 7/6/2005 | P | DONE |
Forrest France
|
|
|
Discussed req. for fire sprinkler final.
|
BLD-Framing/Rough-in | 6/7/2005 | 6/8/2005 | 6/8/2005 | A | PASS |
Dave Hannah
|
|
|
odi - Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Energy code compliance | 5/13/2005 | 5/16/2005 | 5/16/2005 | A | PASS |
Dave Hannah
|
|
|
exterior wall only///odie ###-#### ok to cover ext walls
|
BLD-Framing/Rough-in | 5/6/2005 | 5/9/2005 | 5/10/2005 | P | PART |
Dave Hannah
|
|
|
odi; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesok to insulate ext walls ok to cover all int walls and plumbing walls after plumb r/i
|