BLD-Final | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PASS |
Dave Hannah
|
|
|
Ken -- reinspection; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
DOC - Permit Finaled | 3/27/2006 | 3/27/2006 | 3/27/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/23/2006 | 3/24/2006 | 3/24/2006 | P | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/23/2006 at 10:15:24 PM. Contact: ###-####.
|
BLD-Grading Inspection | 3/22/2006 | 3/22/2006 | 3/22/2006 | | BOND |
|
|
|
Rough grading is complete however fine grading and restoration of the disturbed hillside must still be done. For this a $500.00 bond is required. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Energy code compliance | 12/1/2005 | 12/1/2005 | 12/1/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/1/2005 at 7:45:22 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/28/2005 | 11/29/2005 | 11/29/2005 | A | PASS |
Dave Hannah
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to insulate c/n items completed also ok to cover ext
|
BLD-Framing/Rough-in | 11/23/2005 | 11/25/2005 | 11/25/2005 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/23/2005 at 3:59:13 PM. Contact: ###-####. c/n posted,, verify that STAMPED CITY PLANS ARE ON SITE,, not just front paperwork attached to plain plans,,, misc. other corrections,, shear c/n posted as well
|
BLD-Framing/Rough-in | 11/21/2005 | 11/22/2005 | 11/22/2005 | P | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/21/2005 at 9:06:11 PM. Contact: ###-####.
|
BLD-Foundation | 7/25/2005 | 7/25/2005 | 7/25/2005 | P | PASS |
Dave Hannah
|
|
|
tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 7/12/2005 | 7/13/2005 | 7/13/2005 | A | PASS |
Dave Hannah
|
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|