BLD-Aging Inspection | 8/2/2006 | 8/2/2006 | 8/2/2006 | | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 8/2/2006 | 8/2/2006 | 8/2/2006 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 5/22/2006 | 5/23/2006 | 5/23/2006 | A | PASS |
Mike Jordan
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok for perm occ.
|
FIRE-Final Inspection | 5/22/2006 | 5/22/2006 | 5/22/2006 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Aging Inspection | 5/19/2006 | 5/22/2006 | 5/22/2006 | A | DONE |
Mike Jordan
|
|
|
Left c/n with owner. He stated that all work was completed and would call in for the necessary finals.
|
BLD-Aging Inspection | 5/19/2006 | 5/19/2006 | 5/19/2006 | | CANC |
Mike Jordan
|
|
|
Called Scott. Scott noted that owner was going to repair remaining items. He also noted that he would contact owner and have owner call me. Will reschedule inspection for Monday morning and issue a c/n if owner has not contacted me by friday 5:00pm.
|
BLD-Aging Inspection | 10/21/2005 | 10/21/2005 | 10/27/2005 | | NR |
Troy Cobbley
|
|
|
I left a message for Scott to get this finaled.
|
FIRE-Final Inspection | 8/3/2005 | 8/3/2005 | 8/3/2005 | P | FAIL |
Troy Cobbley
|
|
|
scott; Phone #: ###-#### Sprinkler pendant is spaced too far off of west wall of the new office, provide annual inspection for both fire extinguishers, repair the exit light at the main exit.
|
FIRE-Final Inspection | 8/2/2005 | 8/3/2005 | 8/3/2005 | A | FAIL |
Troy Cobbley
|
|
|
scott; Phone #: ###-#### Could not get ahold of contractor listed above and the girl behind the counter thought that the drawings had been thrown away.
|
BLD-Framing/Rough-in | 7/15/2005 | 7/18/2005 | 7/18/2005 | A | PASS |
Tom Arcoraci
|
|
|
SCOTT; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/12/2005 | 7/13/2005 | 7/13/2005 | A | PART |
Jim Storey
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa need others and top of wall bracing.
|