BLD-Final | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | PASS |
Mike Jordan
|
|
|
Chris; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. egress ladders were installed.
|
DOC - Permit Finaled | 3/6/2006 | 3/6/2006 | 3/6/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | FAIL |
Mike Jordan
|
|
|
Chris -- call 1st before inspection for lockbox code access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Needs egress ladders in window wells at bedrooms.
|
BLD-Energy code compliance | 11/21/2005 | 11/21/2005 | 11/22/2005 | P | PASS |
Mike Jordan
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Areas requiring fireblovking were batted.
|
BLD-Energy code compliance | 11/16/2005 | 11/17/2005 | 11/17/2005 | A | PASS |
Mike Jordan
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Energy code compliance | 11/16/2005 | 11/16/2005 | 11/16/2005 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/16/2005 at 7:40:03 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 11/14/2005 | 11/15/2005 | 11/15/2005 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 11/14/2005 at 1:34:28 PM. Contact: ###-####. Still need previously noted hangars. All other items on c/n are complete.
|
BLD-Framing/Rough-in | 11/10/2005 | 11/14/2005 | 11/14/2005 | A | FAIL |
Mike Jordan
|
|
|
chris; Phone #: ###-#### Note: Please call 1/2 hr prior to inspection Internet Inspection Request from: Cathy Chiles. Provide tall wall engineering. Provide additional 2x6 studs at CG truss bearing. Provide strapping at top plates at bearing walls in basement. (either side of stairway) Complete lateral bracing at AR2 and CG trusses. Provide HGUS26-2 hangars at A3B and FG trusses as noted on truss engineering.
|
BLD-Framing/Rough-in | 11/9/2005 | 11/10/2005 | 11/10/2005 | P | FAIL |
Mike Jordan
|
|
|
chris; Phone #: ###-#### Please call 1/2 hr priro to inspection Internet Inspection Request from: Cathy Chiles. No plans or truss engineering on site.
|
BLD-Framing/Rough-in | 11/7/2005 | 11/8/2005 | 11/8/2005 | P | NR |
Mike Jordan
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Needs plumbing ri inspection. No plans or truss engineering on site.
|
BLD-Foundation | 8/1/2005 | 8/2/2005 | 8/2/2005 | A | PART |
Tom Arcoraci
|
|
|
logan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 7/28/2005 | 7/28/2005 | 7/28/2005 | P | PASS |
Tom Arcoraci
|
|
|
logan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 7/27/2005 | 7/27/2005 | 7/27/2005 | P | CANC |
Tom Arcoraci
|
|
|
logan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 7/12/2005 | 7/13/2005 | 7/13/2005 | A | PASS |
Mike Jordan
|
|
|
donny; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Set backs approved per p&z. Reviewed engineering changing the #6 Vert. reinforcement to #4 reinforcement to 10 inch o.c.-ok to place conc.
|
BLD-Foundation | 7/8/2005 | 7/8/2005 | 7/8/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/8/2005 at 7:25:45 AM. Contact: ###-####. side setbacks wrong
|
BLD-Footing | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 10:03:10 AM. Contact: ###-####. wip ok
|