BLD-Final | 9/1/2005 | 9/2/2005 | 9/2/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/1/2005 at 10:10:58 AM. Contact: ###-####.ok for perm occ
|
FIRE-Final Inspection | 9/2/2005 | 9/2/2005 | 9/2/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Permanent Occupancy | | 9/2/2005 | 9/2/2005 | | DONE |
|
|
|
|
BLD-Final | 8/31/2005 | 9/1/2005 | 9/1/2005 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 12:40:34 PM. Contact: ###-####.
|
FIRE-Final Inspection | 8/30/2005 | 8/31/2005 | 8/31/2005 | A | FAIL |
Forrest France
|
|
|
Need to install fire extinguishers with current inspection tags, provide permanent suite address.
|
BLD-Final | 8/30/2005 | 8/31/2005 | 8/31/2005 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/30/2005 at 12:13:44 PM. Contact: ###-####. needs fire sign offs
|
BLD-Other | 8/9/2005 | 8/9/2005 | 8/10/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/9/2005 at 9:57:13 AM. Contact: ###-####. ceiling grid ok to cover east half and hall ways
|
BLD-Framing/Rough-in | 7/21/2005 | 7/21/2005 | 7/21/2005 | P | PASS |
Tom Arcoraci
|
|
|
dave ###-####
|
BLD-Framing/Rough-in | 6/28/2005 | 6/29/2005 | 6/29/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/28/2005 at 3:21:12 PM. Contact: ###-####.
|