BLD-Final | 8/10/2005 | 8/11/2005 | 8/11/2005 | A | PASS |
Tom Arcoraci
|
|
|
david -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
DOC - Permit Finaled | 8/11/2005 | 8/11/2005 | 8/11/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 8/9/2005 | 8/10/2005 | 8/10/2005 | A | NR |
Tom Arcoraci
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/5/2005 | 7/6/2005 | 7/6/2005 | A | PASS |
Tom Arcoraci
|
|
|
david; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Concrete | 6/8/2005 | 6/9/2005 | 6/9/2005 | A | PASS |
Tom Arcoraci
|
|
|
around 2 if possible////david; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 6/2/2005 | 6/2/2005 | 6/3/2005 | P | DONE |
Dave Hannah
|
|
|
per bob
|
BLD-Footing | 6/2/2005 | 6/2/2005 | 6/2/2005 | P | PART |
Dave Hannah
|
|
|
please call 15 min prior to inspection//david; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa needs to dig ftg deeper ok to pour after that tald dave that bottom of ftg needs to be 24 inchs below finished grade
|