Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01407
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project NameMicron Building #80
Customer NumberC8119
ePlanReviewNo
Description
Micron Building #80 - To alter an existing open office space to create a new 200 sq. ft. office along the north wall within the existing open office space. This office will match the standard within the building (i.e., gyp. board walls and a half-lite in the door). The walls will penetrate the ceiling grid by 6" with extra acoustic measures taken at the ceiling tile and sound insulation. Construction will consist of demolition of minimal ductwork and reconstruction of hardwall systems, ceiling grid, floor base, HVAC, lights and Fire Sprinkler modifications. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/14/20057/14/20057/14/2005PPASS
DetailsJim Storey
wayne ###-#### l/c isued
FIRE-Final Inspection7/13/20057/14/20057/14/2005APASS
DetailsTroy Cobbley
Fire life safety finaled
DOC - Permit Finaled7/14/20057/14/20057/14/2005PPASS
DetailsJim Storey
FIRE-Final Inspection7/11/20057/12/20057/12/2005AFAIL
DetailsTroy Cobbley
Need to final the sprinkler permit. Life safety ok to final when sprinkler permit is finaled
FIRE-Final Inspection7/6/20057/7/20057/7/2005ACANC
DetailsTroy Cobbley
Did not perform life safety inspection due to not being able to perform the fire sprinkler inspection.
BLD-Other6/29/20056/29/20056/29/2005PPART
DetailsJim Storey
Ceiling grid inspection; Phone #: ###-#### Internet Inspection Request from: Wayne Berry main grid support at east side of office wall/ hvac box supply wir support.