Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD05-01557
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 333 N 1ST ST
Project NameST LUKES
Customer Number 
ePlanReviewNo
Description
(ST LUKES-MEDICAL OFFICE PLAZA-1ST FLR)(MATERNAL FETAL MEDICINE) Building sprinklered for allowable area increase. To remodel two existing tenant spaces to become one doctor's office of 5,323 sq. ft. per approved plans. Work includes selective demolition; infill of corridor door area with 1-hour construction to maintain 1-hour corridor rating; construction of new interior non-bearing, non-combustible walls to create office's, exam rooms, accessible restrooms, breakroom, reception, waiting and support areas; install suspended ceiling grid system within selected areas; upgrade electrical, mechanical, plumbing, sprinkler & alarm systems to meet tenant needs and minimum code compliance. (drs)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/11/20065/15/20065/15/2006APASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/11/2006 at 8:54:51 AM. Contact: ###-####. ok for perm occ
Permanent Occupancy 5/15/20065/15/2006 DONE
Details
FIRE-Final Inspection5/9/20065/10/20065/10/2006APASS
DetailsForrest France
Fire life safety is satisfactory, inspection passed.
BLD-Final5/3/20065/4/20065/4/2006AFAIL
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/3/2006 at 10:20:20 AM. Contact: ###-####.needs fire sign offs
BLD-Foundation11/14/200511/15/200511/15/2005ACANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/14/2005 at 9:44:02 AM. Contact: ###-####.
Called wrong insp in.
BLD-Footing11/14/200511/14/200511/14/2005PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/14/2005 at 9:43:18 AM. Contact: ###-####.
BLD-Wall cover10/24/200510/25/200510/25/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/24/2005 at 1:37:09 PM. Contact: ###-####. ok to move into phase one area so phase two can start demo
BLD-Framing/Rough-in10/12/200510/13/200510/13/2005APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/11/2005 at 7:20:56 AM. Contact: ###-####.ceiling grid grid ok
BLD-Framing/Rough-in10/12/200510/12/200510/13/2005PDEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/11/2005 at 7:20:56 AM. Contact: ###-####.ceiling grid out of time rescheduled
BLD-Wall cover10/11/200510/12/200510/13/2005ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/11/2005 at 7:20:56 AM. Contact: ###-####. out of time rescheduled
BLD-Wall cover8/24/20058/25/20058/25/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/24/2005 at 7:05:38 AM. Contact: ###-####.ok to cover infill walls still needs to finish corr walls