BLD-Final | 9/16/2005 | 9/19/2005 | 9/19/2005 | A | PASS |
Dave Hannah
|
|
|
after 9 please////russ; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm occ
|
Permanent Occupancy | | 9/19/2005 | 9/19/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/12/2005 | 9/12/2005 | 9/12/2005 | P | PASS |
Forrest France
|
|
|
A fire sprinkler permit has been issued, work inspected and approved, fire life safety finaled.
|
BLD-Final | 8/22/2005 | 8/22/2005 | 8/23/2005 | P | PART |
Dave Hannah
|
|
|
please call when on way///russ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for temp occ ok for perm occ after fire gos perm
|
FIRE-Final Inspection | 8/19/2005 | 8/22/2005 | 8/22/2005 | A | PART |
Forrest France
|
|
|
Temporary occupancy approved with Sam Rogers permission pending completion of an FIR permit to add one fire sprinkler head due to ductwork obstruction. All other life safety issues are acceptable.
|
FIRE-Conference | 8/16/2005 | 8/16/2005 | 8/16/2005 | P | DONE |
Forrest France
|
|
|
On site discussion with Russ regarding life safety issues including fire ext., emergency lighting, door hardware, fire sprinklers and addressing.
|