Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01680
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 105 N 10TH ST
Project NameGEM NOBLE BLDG-Take 5 Salon
Customer Number 
ePlanReviewNo
Description
(TAKE 5 HAIR SALON - GEM NOBLE BLDG - 1ST STORY) (3-5-09 PLAN MODIFICATION TO PROVIDE EXHAUST FOR MANICURE/PEDICURE STATIONS.) This building will be fire sprinklered for building area increase and for story increase. To remodel an existing 695 square foot hair salon tenant space. This space is located on the 1st story (near the Northeast corner) of an existing 2 story with basement historic building (11,400 square foot basement, 11,400 square foot 1st story, 11,500 square foot 2nd story). A permit to renovate the entire building (BLD04-01154) was issued on August 18, 2004. Work is to include interior nonbearing walls, a restroom accessible to the disabled, and interior finishes. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system that will be installed under the renovation permit shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/15/20097/20/20097/20/2009APASS
DetailsDave Hannah
Per your request to final?
FIRE-Final Inspection7/15/20097/20/20097/20/2009APASS
DetailsForrest France
Fire life safety final inspection passed.
BLD-Final5/28/20095/28/20095/28/2009PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/28/2009 at 11:12:51 AM. Contact: ###-####. ok for temp occ ok for perm occ after other trades go perm and shell is finaled
FIRE-Final Inspection5/28/20095/28/20095/28/2009PPASS
DetailsForrest France
Fire life safety final okayed when project related fire alarm permit is detatched from this building permit per agreement with S. Arellano and M. Senteno.
FIRE-Conference5/14/20095/14/20095/14/2009PDONE
DetailsForrest France
Regarding alarm and sprinkler permit work, discussed PFE location.
FIRE-Final Inspection5/13/20095/13/20095/13/2009PNR
DetailsForrest France
Notified contractor of project related fire alarm and sprinkler permits in need of inspection prior to BLD fire life safety approvals.
BLD-Final5/13/20095/13/20095/13/2009PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/13/2009 at 10:19:41 AM. Contact: ###-####.
BLD-Conference2/27/20092/27/20093/2/2009PPASS
DetailsDave Hannah
dennis Phone #: ###-####
BLD-Conference1/13/20091/14/20091/14/2009APASS
DetailsDave Hannah
bob Phone #: ###-####
BLD-Aging Inspection12/10/200812/10/200812/10/2008 PASS
DetailsDave Hannah
DOC - Permit Expired12/10/200812/10/200812/10/2008APASS
DetailsDave Hannah
BLD-Aging Inspection3/7/20083/7/20083/7/2008 PART
DetailsDave Hannah
work was stopped this project is tied up in backruptcy
BLD-Framing/Rough-in4/20/20074/20/20074/20/2007PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/19/2007 at 9:50:26 PM. Contact: ###-####. shear wall ok to cover
BLD-Wall cover4/19/20074/20/20074/20/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 4/19/2007 at 9:50:26 PM. Contact: ###-####.
BLD-Framing/Rough-in9/23/20059/23/20059/26/2005PPART
DetailsDave Hannah
Jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover ceiling