Permit Information
Permit NumberBLD05-01783
StatusFinaled
Name DATON CONSTRUCTION
Site Address 13176 W PERSIMMON LN
Project NameLot 4 Mahogany Business Park
Customer Number 
ePlanReviewNo
Description
(DEBLIECK DERMATOLOGY) To construct and finish 3,197 sq.ft. of an existing 5,750 sq. ft. shell building for use as a doctor's office per approved plans. Work includes construction of interior non-bearing walls to create three fully accessible restrooms, two of which will be for common use with future tenant; to create waiting, reception, exam, procedure and support room areas; to maintain / finish attic draft stop, upgrade electrical, mechanical and plumbing; install suspended ceiling grid system, millwork and interior finishes. (drs)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/20/200510/21/200510/21/2005APASS
DetailsJim Sly
randy ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. ok for perm occ. All items on posted c/n have been completed.
BLD-Final10/4/200510/5/200510/5/2005APART
DetailsJim Sly
early as possible///randy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
OK for Temp Occ. C/N Need to raise grab bars behind toilet in both restrooms....(resting on lid) Max height 36" to top. Need final for Perm from both Electr and Mech. Obtain Perm Occ status within 90 days of this notice.
FIRE-Final Inspection10/3/200510/4/200510/4/2005APASS
DetailsTroy Cobbley
fire life safety passed.
BLD-Final10/3/200510/4/200510/4/2005PNR
DetailsJim Sly
early pm please//randy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
FIRE-Final Inspection9/30/200510/3/200510/3/2005PFAIL
DetailsTroy Cobbley
Provide street address and suite number, provide remote annunciators for the hvac units and test the units, provide and repair exit signs as per the approved plans, provide fire extinguisher per the review comments. A permanent egress solution will be needed for the common restrooms prior to final signoff of any future tenant.
BLD-Final10/3/200510/3/200510/3/2005PNR
DetailsJim Sly
late pm please///randy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Need all signatures
BLD-Final9/30/200510/3/200510/3/2005ACANC
DetailsMike Jordan
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in9/26/20059/26/20059/26/2005PPASS
DetailsJim Sly
adam Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Letter from architect changing ceiling to "as built " in lieu of ceiling per plan.
BLD-Framing/Rough-in9/13/20059/13/20059/13/2005PFAIL
DetailsTom Arcoraci
ceiling grid inspection///randy ###-#### not installed per app plans
BLD-Energy code compliance8/15/20058/16/20058/16/2005APART
DetailsJim Sly
please call when get there//dean ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
Conf inspection.......Reminder....complete draftstop above new ceiling.
BLD-Energy code compliance8/9/20058/10/20058/10/2005PPASS
DetailsMike Jordan
as late as possible and please call prior to inspection so he can meet ya there please////dean; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Exterior walls only.