Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-01861
StatusFinaled
Name K2 CONSTRUCTION
Site Address 8505 W OVERLAND RD
Project NameRGJ Investments
Customer Number 
ePlanReviewNo
Description
RGJ Investments Phase III (Shell Building Only) - To construct a new 15,750 square foot, one story, wood framed retail shell building and related site improvements. This building will be separated into two 7,875 square foot, fire areas by a two-hour fire-resistive masonry fire wall located at grid line #5. This is a shell permit only and no occupancy is allowed under this permit. Separate tenant improvement permits are required to finish this building for occupancy. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/1/20069/5/20069/5/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 9/1/2006 at 12:50:03 PM. Contact: (208) 863-291 Shell and core ok. cert of comp. was issued.
DOC - Permit Finaled9/5/20069/5/20069/5/2006PPASS
DetailsMike Jordan
Shell and core final ok. Code enforcement sighned temp only due to missig bark. Did note that bark has been installed and noted to contractor to call code enforcement for final insp.
FIRE-Final Inspection8/30/20068/30/20068/30/2006PPASS
DetailsTroy Cobbley
Life safety finaled
Code Occupancy Approval Temp8/25/20068/25/20068/28/2006PFAIL
DetailsScott M.Brown
I ONLY SIGNED TEMP OCCUPANCY DUE TO MISSING BARK ON WEST SIDE.
FIRE-Final Inspection8/24/20068/25/20068/25/2006AFAIL
DetailsTroy Cobbley
Provide address and repair the west side emergency discharge light.
BLD-Framing/Rough-in8/23/20068/23/20068/23/2006PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/23/2006 at 9:14:15 AM.
BLD-Energy code compliance8/23/20068/23/20068/23/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/23/2006 at 9:14:15 AM.
BLD-Aging Inspection8/9/20068/9/20068/9/2006 PASS
DetailsMike Jordan
wip
BLD-Framing/Rough-in6/5/20066/5/20066/5/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/5/2006 at 9:49:49 AM. Contact: ###-####. Reveiwed submitted UL specs for listed penetrations and inspected penetrations at masonry wall and at mdf walls.
BLD-Framing/Rough-in5/11/20065/12/20065/12/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/11/2006 at 2:59:00 PM. Contact: ###-####. shear nailing on exterior of bldg. ok to cover. Needs to get data for elec. penetrations in 1hr rated wood panels.
BLD-Framing/Rough-in4/25/20064/25/20064/25/2006PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 4/25/2006 at 7:36:14 AM. Contact: ###-####.
OK to install soffit material.
BLD-Framing/Rough-in4/11/20064/12/20064/12/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/11/2006 at 9:59:16 AM. Contact: ###-####. Inspected shear nailing on south wall, roof sheating and all related hardware, holdowns and roof trusses. Noted all strapping on bldg. walls is complete. wip on straps from lvl's to bldg. Also noted wip on the two hour firewall extension from cmu wall out to canopy down to the soffit. Noted letter from engineer approving the use of fire rated plywood on exterior of bldg. in leiu of the two layers of 5/8 type X at either side of masonry wall.
BLD-Foundation3/15/20063/15/20063/15/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/15/2006 at 11:02:16 AM. Contact: ###-####. Exterior column pad pedestals, west side of building.
BLD-Footing3/14/20063/14/20063/14/2006PPASS
DetailsJim Storey
harvey; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa east pad ft ok.
BLD-Foundation2/13/20062/14/20062/14/2006APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/13/2006 at 3:01:38 PM. Contact: ###-####. Noted some clearance issues. Special insp. to verify repair.
BLD-Footing2/8/20062/9/20062/9/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/8/2006 at 12:29:15 PM. Contact: ###-####. perimeter footings and footing for masonry seperation wall.