BLD-Final | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/22/2005 at 2:44:36 PM. Contact: ###-####. ok for perm occ
|
Permanent Occupancy | | 11/23/2005 | 11/23/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety passed inspection.
|
BLD-Final | 11/21/2005 | 11/21/2005 | 11/21/2005 | A | NR |
Tom Arcoraci
|
|
|
|
BLD-Final | 11/18/2005 | 11/21/2005 | 11/21/2005 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/18/2005 at 5:12:15 PM. Contact: ###-####.
|
BLD-Final | 11/17/2005 | 11/18/2005 | 11/18/2005 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/17/2005 at 6:42:56 PM. Contact: ###-####.90 min door needs instaled/ exitpath to be maintaned/ firestopping ok above ceilling.
|
BLD-Other | 10/5/2005 | 10/6/2005 | 10/7/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/5/2005 at 11:55:25 AM. Contact: ###-####. ceiling grid ok but still need to wire up two light in main area
|
BLD-Other | 9/12/2005 | 9/12/2005 | 9/12/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/12/2005 at 9:49:27 AM. Contact: ###-####. lighs not wired up and gide is rivitted
|
BLD-Framing/Rough-in | 8/18/2005 | 8/19/2005 | 8/19/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/18/2005 at 11:09:43 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/18/2005 | 8/19/2005 | 8/18/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/18/2005 at 10:55:46 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 18 2005 11:06AM.
|