BLD-Final | 12/14/2005 | 12/15/2005 | 12/15/2005 | P | PASS |
Tom Arcoraci
|
|
|
robie ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm occ
|
FIRE-Final Inspection | 12/14/2005 | 12/15/2005 | 12/15/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety passed inspection, c/n items have been completed as required.
|
Permanent Occupancy | | 12/15/2005 | 12/15/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 12/13/2005 | 12/14/2005 | 12/14/2005 | P | FAIL |
Troy Cobbley
|
|
|
Repair the south emergency light, provide sticker at door, provide indicator at keyed exterior exit door. Duct smoke detectors not required. Contractor still needs to get the 5" outlet of the fire hydrant turned towards the driveway.
|
BLD-Energy code compliance | 10/20/2005 | 10/21/2005 | 10/24/2005 | P | PASS |
Dave Hannah
|
|
|
robbie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover talked with G z plumning is ok
|
BLD-Framing/Rough-in | 10/18/2005 | 10/19/2005 | 10/19/2005 | A | PASS |
Dave Hannah
|
|
|
ROBBIE; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to insulate after plumbing signs off rough in
|