BLD-Final | 10/25/2005 | 10/25/2005 | 10/25/2005 | P | PASS |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
|
FIRE-Final Inspection | 10/24/2005 | 10/25/2005 | 10/25/2005 | A | PASS |
Forrest France
|
|
|
The fire sprinkler issues have been corrected, fire life safety finaled.
|
FIRE-Final Inspection | 10/24/2005 | 10/24/2005 | 10/24/2005 | P | CANC |
Forrest France
|
|
|
No time available for this inspection today, spoke with contractor to reschedule for tomorrow am.
|
BLD-Final | 9/21/2005 | 9/22/2005 | 9/22/2005 | A | PART |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for temp occ ok for perm after others go perm
|
FIRE-Final Inspection | 9/21/2005 | 9/22/2005 | 9/22/2005 | A | PART |
Forrest France
|
|
|
Fire life safety passed inspection, final pending approval of sprinkler modifications on resubmittals. A temporary occupancy was approved with Sam Rogers permission pending sprinkler sign off.
|
FIRE-Final Inspection | 9/21/2005 | 9/21/2005 | 9/21/2005 | A | FAIL |
Forrest France
|
|
|
Repair emergency light at north stairway, provide lever hardware at restroom, provide directional arrow at main exit sign, need to final sprinkler permit prior to life safety.
|
BLD-Final | 9/21/2005 | 9/21/2005 | 9/21/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/21/2005 at 7:28:35 AM. Contact: ###-####. needs fire life safty and fire sprinckler sign off no inspection done
|
FIRE-Conference | 9/13/2005 | 9/14/2005 | 9/14/2005 | A | DONE |
Forrest France
|
|
|
On site confrence to discuss location of an exit sign and emergency lighting in the north stairway.
|
FIRE-Conference | 8/24/2005 | 8/25/2005 | 8/25/2005 | A | DEFR |
Forrest France
|
|
|
dave; Phone #: ###-#### On site discussion with Dave regarding exit signage, the fire sprinkler permit, fire extinguisher placement, door hardware, building address, and emergency lighting.
|
BLD-Framing/Rough-in | 8/22/2005 | 8/22/2005 | 8/23/2005 | P | PASS |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover walls
|
BLD-Conference | 8/19/2005 | 8/22/2005 | 8/23/2005 | A | DONE |
Dave Hannah
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 8/22/2005 | 8/22/2005 | 8/22/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/22/2005 at 10:21:20 AM. Contact: ###-####.
|