Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-01996
StatusFinaled
Name H & M BUILDERS INC.
Site Address 3707 S MAZE PL
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the addition of 240s.f. to an existing 1660s.f. 1-story single family dwelling. "The permit holder is responsible to comply with current wall bracing requirements as adopted by Boise City." The work is to include the conversion of an existing bedroom to a master suite bath and converting an existing bathroom to a storage closet. R-1C setbacks ok per Colleen Carroll. Separate electrical, plumbing, mechanical and ESC permits are required. All per the approved plans as marked, REScheck and plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/23/20062/27/20062/27/2006PPASS
DetailsTom Arcoraci
need 30 min prior notice to meet you -- Joe ###-####//Scheduled by a contractor via Hello! on 2/23/2006 at 9:11:42 AM. Contact: ###-####.
DOC - Permit Finaled2/27/20062/27/20062/27/2006PPASS
DetailsTom Arcoraci
BLD-Final2/14/20062/16/20062/16/2006PNR
DetailsJim Storey
Scheduled by a contractor via Hello! Please contact joe ###-#### for access on 2/14/2006 at 7:48:08 AM. Contact: ###-#### russ.need ele final
BLD-Wall cover9/16/20059/21/20059/21/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/16/2005 at 9:00:49 PM. Contact: ###-####.
BLD-Energy code compliance9/16/20059/20/20059/20/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/16/2005 at 8:59:26 PM. Contact: ###-####.
BLD-Framing/Rough-in9/16/20059/19/20059/19/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/16/2005 at 8:31:17 PM. Contact: ###-####.
BLD-Framing/Rough-in9/15/20059/16/20059/16/2005APART
DetailsJim Storey
steve; Phone #: ###-#### Internet Inspection Request from: Barbara Moore strap top plat at exsting bearing walls/ air seal ok to insulate.
BLD-Footing8/8/20058/9/20058/9/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 8/8/2005 at 4:50:54 PM. Contact: ###-####.
wip