Description
Fresca Mexican Foods (Addition) -To construct a 26,177 sq. ft. two story type III-B addition on the south and west side of an existing building. Other work includes upgrade of an existing wall to a 3 hr fire wall in the existing freezer, conversion of the construction type of the existing building from VN to III-B which includes demolition of a small office area on the west side of wood frame, all site improvements, paving and landscaping per approved plans and attachments. The existing building and the new addition are to be fully fire sprinklered with a fire alarm system. Fire sprinklers used for area. Building has been calculated for unseparated uses. First floor 24,875 sq ft, Second floor 1302 sq ft.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/26/20067/27/20067/27/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 7/26/2006 at 3:03:46 PM. Contact: ###-####. All issues have been resolved. ok for perm occ.
Permanent Occupancy 7/27/20067/27/2006 DONE
Details
Code Occupancy Approval  7/12/2006 PASS
OK FOR FINAL AND RELEASE OF BOND
BLD-Final6/23/20066/26/20066/26/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/23/2006 at 1:18:26 PM. Contact: ###-####. ok for temp occ. Need final aff. letter from special insp. firm. Also noted that handrail for stairway to mech. does not have proper clearance at two points from guard and does not return properly at top. Contractor noted that access to these stairs is not needed and wiil be closed off so that no access is granted until it is repaired. these stairs not part of exut system.
FIRE-Final Inspection6/23/20066/26/20066/26/2006 PASS
DetailsTroy Cobbley
Life safety finaled.
Letters of certification by James C. Peterson, PE, designer of the ammonia refrigeration sytem and David Musgrove, PE, regarding the flour dust system were provided to the fire inspector certifying that both systems have been inspected by themselves and are designed and installed in accordance with applicable IMC and IFC code requirements. The letters have been filed with the permanent permit plan documents. (SLR)
BLD-Final6/22/20066/23/20066/23/2006PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 6/22/2006 at 1:23:07 PM. Contact: ###-####. Fire failed.
FIRE-Final Inspection6/22/20066/23/20066/23/2006AFAIL
DetailsTroy Cobbley
Need the two letters and the bell rewired as discussed.
FIRE-Final Inspection6/19/20066/20/20066/21/2006PFAIL
DetailsTroy Cobbley
Need two letters from engineers as per the review comments. Fire dept. access road does not meet the agreed upon 17' width. Also need to final sprinklers and alarm.
BLD-Framing/Rough-in6/9/20066/12/20066/12/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/9/2006 at 3:02:53 PM. Contact: ###-####.
break room ceiling grid ok
BLD-Framing/Rough-in5/2/20065/3/20065/3/2006APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 5/2/2006 at 3:45:40 PM. Contact: ###-####. Screw pattern for interior shearwalls at mezz. Also reveiwed engineers RFI noting that holdowns that were inspected were not required at those locations.
BLD-Framing/Rough-in4/21/20064/24/20064/24/2006APART
DetailsMike Jordan
Interior steel stud walls, interior shear nailing and hold downs. Need RFI engineer noting placement of hold downs for shear on mezz. walls.
BLD-Framing/Rough-in4/20/20064/21/20064/21/2006PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/20/2006 at 3:43:01 PM. Contact: ###-####. moved to monday.
BLD-Foundation12/12/200512/13/200512/13/2005APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/12/2005 at 3:17:09 PM. Contact: ###-####. masonry wall, 0 to 4ft elev. east wall.
BLD-Footing11/23/200511/28/200511/28/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/23/2005 at 2:59:46 PM. Contact: ###-####. NW perimeter footings and footings at ewest side of existing bldg.
BLD-Footing11/15/200511/16/200511/16/2005APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 11/15/2005 at 10:20:15 AM. perimeter footings at east south and partiall west end and against existing bldg.