Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD05-02073
StatusFinaled
Name ST ALPHONSUS REGIONAL MEDICAL CNTR
Site Address 1097 N CURTIS RD
Project NameST AL'S -CANCER CARE CNTR
Customer Number 
ePlanReviewNo
Description
(ST ALPHONSUS)(CANCER CARE CENTER) To remodel and upgrade specific portions of the basement, 1st and 2nd floors consisting of an total existing 13,259 sq.ft. area of the building per approved plans. Work includes selective demolition; installation of new elevator serving basement, 1st & 2nd levels; remodel for office, treatment & exam rooms and support areas on 1st & 2nd levels; upgrade of ceilings, interior finishes, millwork, electrical, plumbing, mechanical, sprinkler & alarms systems all per approved plans, notes on plans and all attached documentation and plan reviews of all reviewing agencies. (drs)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/19/20071/22/20071/22/2007PPASS
DetailsTom Arcoraci
carl; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Final1/19/20071/22/20071/22/2007PCANC
DetailsTom Arcoraci
FIRE-Final Inspection1/19/20071/22/20071/22/2007APASS
DetailsTroy Cobbley
permit finaled
Permanent Occupancy 1/22/20071/22/2007 DONE
Details
FIRE-Final Inspection1/19/20071/19/20071/19/2007PFAIL
DetailsTroy Cobbley
Need fire alarm and fire sprinkler finaled first.
BLD-Final1/19/20071/19/20071/19/2007PNR
DetailsTom Arcoraci
carl - late afternoon please; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Other1/9/20071/10/20071/10/2007APASS
DetailsTom Arcoraci
carl Note: above ceiling inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall corridor ok to install grid
FIRE-Conference12/26/200612/27/200612/27/2006ADONE
DetailsTroy Cobbley
Contractor wanted to "turn over" several rooms to St. Als for use. I stated that I would not be ok with that because the egress corridor from these rooms would have an inoperative fire alarm system.
BLD-Other11/30/200612/1/200612/1/2006APART
DetailsTom Arcoraci
carl - note: ceiling ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Aging Inspection11/17/200611/17/200611/17/2006 PASS
DetailsTom Arcoraci
BLD-Aging Inspection9/15/20069/15/20069/15/2006 PASS
DetailsTom Arcoraci
BLD-Final7/7/20067/10/20067/10/2006PPART
DetailsTom Arcoraci
CARL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for 2nd floor
FIRE-Final Inspection7/7/20067/10/20067/10/2006APART
DetailsTroy Cobbley
The second floor only is ok to occupy.
BLD-Final7/6/20067/7/20067/7/2006PNR
DetailsTom Arcoraci
karl; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD-Final6/30/20066/30/20067/6/2006PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/29/2006 at 3:43:22 PM. Contact: ###-####.
BLD-Final6/29/20066/30/20067/6/2006ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 6/29/2006 at 3:43:22 PM. Contact: ###-####.
FIRE-Conference6/9/20066/12/20066/12/2006ADONE
DetailsTroy Cobbley
I spoke with Dale about my being ok with construction proceeding with another permit within this permit area
BLD-Conference6/9/20066/12/20066/12/2006APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/9/2006 at 2:17:12 PM. Contact: ###-####. kriesnbeck to do strucral rebuild 2nd floor ceilling under seprtate permit si to be provided. smoke seals on doors in sb and sp not in place not clear on plan may be in listing of door assembly contractor to verify.
BLD-Wall cover5/17/20065/18/20065/18/2006APART
DetailsJim Storey
Rich, ceiling penetration; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt 2nd floor cancer center ok for ceilling insp. list of sealant locations with rich.
BLD-Other4/24/20064/24/20064/24/2006PFAIL
DetailsJim Sly
carl Note: above ceiling structure; Phone #: ###-#### Note: please call 1/2 hr prior Internet Inspection Request from: Cathy Chiles
Corridor Req no rating per table1016.1 Need to caulk corridor for smoke barrier.....missed a lot of penitrations. Need to install smoke/fire damp at openings in corr wall. Went thru all req for "C" cisca 636 ceiling with Carl.
FIRE-Conference4/12/20064/12/20064/12/2006PDONE
DetailsTroy Cobbley
###-#### RICH; I met with Rich and went over fire alarm, fire sprinkler and fire life safety requirements for the Cancer Treatment Center.
BLD-Framing/Rough-in2/23/20062/23/20062/23/2006PPART
DetailsTom Arcoraci
2nd floor walls ok
BLD-Final2/23/20062/23/20062/23/2006PCANC
DetailsTom Arcoraci
rich; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Aging Inspection1/13/20061/13/20061/13/2006 PART
DetailsTom Arcoraci