BLD-Energy code compliance | 12/29/2006 | 12/29/2006 | 12/29/2006 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/29/2006 at 7:05:05 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/20/2006 | 12/21/2006 | 12/21/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/20/2006 at 12:59:37 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 10/26/2006 | 10/27/2006 | 10/27/2006 | A | NR |
Tony Young
|
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Patricia Smith conf. only,, need trades, etc
|
BLD-Framing/Rough-in | 9/15/2006 | 9/18/2006 | 9/18/2006 | A | FAIL |
Mike Jordan
|
|
|
tom ; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Needs to provide truss engineering, complete airseal package. Needs to provide additional header upstairs at truss bearing, add 2x6 at rafters, needed to be 2x10. provide straps at ml header and top plate at lineset. Also needs to install the additional 2x4 studs down stairs on either side of windows as noted on approved plans.
|