BLD-Final | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PEND |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 4:12:49 PM. Contact: ###-####. Temp occ given. Will be ok for perm occ once bond has been posted and public works has finaled on shell and core permit.
|
FIRE-Final Inspection | 6/7/2006 | 6/8/2006 | 6/8/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled. The duct smoke detectors have been removed since they are not required by code.
|
Permanent Occupancy | | 6/8/2006 | 6/8/2006 | | DONE |
|
|
|
|
BLD-Final | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/7/2006 at 8:26:42 AM. Contact: ###-####. Need fire
|
FIRE-Final Inspection | 6/7/2006 | 6/7/2006 | 6/7/2006 | P | FAIL |
Troy Cobbley
|
|
|
Need to final the shell permit, tag the fire extinguisher and either test the duct smoke detetors or remove them since they are not required per code.
|
Extend Permit 180 days | 6/6/2006 | 6/7/2006 | 6/7/2006 | A | CANC |
Jim Sly
|
|
|
Phone #: ###-####
|
BLD-Wall cover | 5/23/2006 | 5/24/2006 | 5/24/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/23/2006 at 3:56:30 PM. Contact: ###-####. Grid OK
|
BLD-Other | 5/22/2006 | 5/23/2006 | 5/23/2006 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 5/22/2006 at 10:57:22 AM. Contact: ###-####.
|
BLD-Other | 4/27/2006 | 4/28/2006 | 4/28/2006 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/27/2006 at 10:58:08 AM. Contact: ###-####.
|
BLD-Energy code compliance | 4/20/2006 | 4/21/2006 | 4/21/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/20/2006 at 10:08:06 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 4/14/2006 | 4/17/2006 | 4/17/2006 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/14/2006 at 1:51:12 PM. Contact: ###-####.
|
BLD-Aging Inspection | 1/19/2006 | 1/19/2006 | 1/24/2006 | | NH |
Jim Sly
|
|
|
WIP
|