BLD-Final | 1/31/2006 | 1/31/2006 | 1/31/2006 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/31/2006 at 7:13:18 AM. Contact: ###-####. ok for prem occ
|
FIRE-Final Inspection | 1/31/2006 | 1/31/2006 | 1/31/2006 | A | PASS |
Forrest France
|
|
|
The c/n item has been completed per D. Hannah, life safety finaled.
|
FIRE-Final Inspection | 1/24/2006 | 1/24/2006 | 1/25/2006 | A | PART |
Forrest France
|
|
|
Life safety is acceptable pending the removal of the manual flush bolts on the inactive leaf of the double doors at the west side of remodel. Contractor to remove prior to structural final for verification of completion.
|
BLD-Final | 1/24/2006 | 1/24/2006 | 1/24/2006 | A | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/24/2006 at 7:20:33 AM. Contact: ###-####.need ele final
|
BLD-Final | 12/30/2005 | 1/3/2006 | 1/4/2006 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/30/2005 at 8:17:37 AM. Contact: ###-####.
|
BLD-Wall cover | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/25/2005 at 7:28:03 AM. Contact: ###-####. ok to cover
|