FIRE-Final Inspection | 9/29/2005 | 9/29/2005 | 9/29/2005 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
BLD-Final | 9/29/2005 | 9/29/2005 | 9/29/2005 | P | PART |
Jim Sly
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa OK for Temp Occ. OK to Perm....when Electr signs off for Perm Occ.
|
Permanent Occupancy | | 9/29/2005 | 9/29/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/28/2005 | 9/28/2005 | 9/28/2005 | P | FAIL |
Troy Cobbley
|
|
|
Install ceiling tile and provide emergency light in the front lobby/retail area.
|
BLD-Final | 9/28/2005 | 9/28/2005 | 9/28/2005 | P | NR |
Mike Jordan
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. failed fire/life.
|
BLD-Final | 9/26/2005 | 9/27/2005 | 9/27/2005 | P | NR |
Jim Sly
|
|
|
jay ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Need Fire
|
FIRE-Final Inspection | 9/26/2005 | 9/27/2005 | 9/27/2005 | A | CANC |
Troy Cobbley
|
|
|
Job is not ready for inspection
|
BLD-Final | 9/23/2005 | 9/26/2005 | 9/26/2005 | P | NR |
Mike Jordan
|
|
|
jay; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Needs fire/life inspection.
|
FIRE-Final Inspection | 9/23/2005 | 9/26/2005 | 9/26/2005 | A | FAIL |
Troy Cobbley
|
|
|
The fire sprinkler plans have been resubmitted per the sprinkler contractor and per the general contractor the fire alarm panel still needs repaired,
|
FIRE-Final Inspection | 9/22/2005 | 9/22/2005 | 9/22/2005 | P | CANC |
Troy Cobbley
|
|
|
No inspection done. No drawings or review notes. I did go over life safety items with the contractor
|
BLD-Final | 9/22/2005 | 9/23/2005 | 9/22/2005 | P | CANC |
Jim Sly
|
|
|
###-#### Jay///cancelled per Jay need to fix FIR problems, will call back to reschedule 9/22/05 4:29pm LEG
|
BLD-Framing/Rough-in | 8/26/2005 | 8/30/2005 | 8/30/2005 | A | PASS |
Jim Sly
|
|
|
brad; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|