BLD-Final | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | PASS |
Mike Jordan
|
|
|
ed ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIRE-Final Inspection | 11/2/2005 | 11/2/2005 | 11/2/2005 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Permanent Occupancy | | 11/2/2005 | 11/2/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 10/31/2005 | 11/1/2005 | 11/1/2005 | P | FAIL |
Troy Cobbley
|
|
|
The new duct smoke detector could not be tested due to problems with the hvac unit. All other items are ok to final when duct detector is tested.
|
BLD-Framing/Rough-in | 10/17/2005 | 10/17/2005 | 10/17/2005 | P | PART |
Jim Storey
|
|
|
ed --; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok pending ele aproval.
|
BLD-Framing/Rough-in | 10/11/2005 | 10/11/2005 | 10/11/2005 | A | PART |
Jim Storey
|
|
|
ok to one side/ front half of store ok to cover fur out walls .
|
BLD-Framing/Rough-in | 10/10/2005 | 10/11/2005 | 10/11/2005 | A | PASS |
Jim Storey
|
|
|
inspection for the demising walls only//edward chemleski; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 10/10/2005 | 10/11/2005 | 10/11/2005 | A | PART |
Jim Storey
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to cover exit corridor and west wall.
|