BLD-Final | 9/12/2005 | 9/13/2005 | 9/13/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 9/12/2005 at 4:51:49 PM. Contact: ###-####. ok for perm occ
|
BLD-Final | 9/13/2005 | 9/13/2005 | 9/13/2005 | P | PASS |
Tom Arcoraci
|
|
|
ok for perm occ
|
FIRE-Final Inspection | 9/12/2005 | 9/13/2005 | 9/13/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
Permanent Occupancy | | 9/13/2005 | 9/13/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/9/2005 | 9/9/2005 | 9/12/2005 | P | FAIL |
Troy Cobbley
|
|
|
dennis-- pending bld fn ; Phone #: ###-#### Provide lever hardware per the approve drawings, mount the fire extinguisher as discussed, provide approved hardware on the east exterior door to meet the old code or provide indicators on both this door and the north door to meet new code.
|
BLD-Final | 9/9/2005 | 9/9/2005 | 9/9/2005 | P | FAIL |
Mike Jordan
|
|
|
dennis-- pending fire fn; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. All dorr hardware needs to be removed. Also some new ceiling grid has been placed and air diffusers moved around, no inspection has been performed. Contractor not on site, noted to tenant that contractor needs to schedule a building confrence.
|