BLD-Final | 7/21/2006 | 7/21/2006 | 7/21/2006 | P | PASS |
Dave Hannah
|
|
|
Scott 608.0925; Phone #: ###-#### Internet Inspection Request from: Scott Simpson
|
DOC - Permit Finaled | 7/21/2006 | 7/21/2006 | 7/21/2006 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Wall cover | 4/27/2006 | 4/28/2006 | 4/28/2006 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ed Thompson
|
BLD-Energy code compliance | 4/28/2006 | 4/28/2006 | 4/28/2006 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ed Thompson
|
BLD-Framing/Rough-in | 4/28/2006 | 4/28/2006 | 4/28/2006 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Ed Thompson. All framing issues have been resolved.
|
BLD-Concrete | 4/25/2006 | 4/26/2006 | 4/26/2006 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Install 2x material at laydown parapet. Install 5/8 type x at ML beams. Install header over doorway from kitchen to utlity rroom. Cover gap between laydown parapet and top plate.
|
BLD-Wall cover | 2/16/2006 | 2/17/2006 | 2/17/2006 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/16/2006 at 3:40:59 PM. Contact: ###-####. Nailing on seperation wall not per assembly.
|
BLD-Foundation | 12/7/2005 | 12/7/2005 | 12/7/2005 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 12/7/2005 at 7:24:58 AM. Contact: ###-####.
|
BLD-Footing | 12/2/2005 | 12/5/2005 | 12/5/2005 | A | PART |
Dave Hannah
|
|
|
ryan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|