Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-02359
StatusFinaled
Name DEVCON CONSTRUCTION INC
Site Address 786 W BROAD ST
Project NameHARO JEWELRY BODO 7
Customer Number 
ePlanReviewNo
Description
(HARO JEWELRY STORE - BODO BLDG #7) This building is fire sprinklered for fire area and to allow the multitheater complex. To construct a retail sales jewelry store within and existing 860 square foot tenant space located on the ground floor of BODO Building #7. Work is to include a restroom accessible to the disabled, interior nonbearing walls, suspended ceilings, and finishes. The work shall comply with the approved drawings, the plan review report, and with all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/4/20064/5/20064/5/2006PPASS
DetailsDave Hannah
paul fishley; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
FIRE-Final Inspection4/4/20064/5/20064/5/2006APASS
DetailsTroy Cobbley
Life safety is acceptable, the related alarm and sprinkler permits are finaled, no signature card available at time of inspection.
Permanent Occupancy 4/5/20064/5/2006 DONE
Details
BLD-Other2/9/20062/9/20062/9/2006 DONE
Temp. Occ. Cert. extended for 90 days per Jenifer thru 5-24-06.
BLD-Final11/22/200511/23/200511/25/2005ADONE
DetailsDave Hannah
Please call when you arrive. Internet Inspection Request from: Alex Monge
BLD-Final11/23/200511/25/200511/25/2005APART
DetailsDave Hannah
Cindee (the owner) of Ellie fine jewelry will be in the store between 7am & 9 am awaiting your signature. She plans to open Firday for business. I have told her that she cannot open without a certificate of occupancy. I appreciate your help. Thank you. Internet Inspection Request from: Alex Monge ok for temp occ needs fire to sign off perm and needs a counter top for ada
BLD-Conference11/21/200511/22/200511/22/2005ANR
DetailsDave Hannah
Please call Dennis for morning inspection. Internet Inspection Request from: Alex Monge needs to finish
FIRE-Final Inspection11/21/200511/21/200511/21/2005PPART
DetailsForrest France
Life safety is acceptable, final pending shell alarm and sprinkler final, currently on a temp. Note ceiling tiles to be replaced-need to verify sprinkler canopies have been reinstalled.
FIRE-Final Inspection11/16/200511/18/200511/18/2005AFAIL
DetailsForrest France
One emergency light at the main entry is not functional, need permanent address numbers, remove tape and paper at the sprinkler heads and install escutcheons.
BLD-Framing/Rough-in10/20/200510/20/200510/24/2005PPASS
DetailsDave Hannah
Rough framing at Jewelry. Call Dennis Harter. Internet Inspection Request from: Alex Monge ok to cover walls