Code Occupancy Approval | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL THIS BUILDING ONLY NOT SUBDIVISION
|
BLD-Final | 8/27/2006 | 8/28/2006 | 8/28/2006 | A | PART |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Temp occ given. Will be ok for perm occ once code enforcement has finaled.
|
FIRE-Final Inspection | 8/23/2006 | 8/24/2006 | 8/24/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Aging Inspection | 8/10/2006 | 8/10/2006 | 8/10/2006 | | PASS |
Mike Jordan
|
|
|
wip
|
BLD-Energy code compliance | 5/30/2006 | 5/31/2006 | 5/31/2006 | A | PASS |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. All framing issues have been resolved.
|
BLD-Other | 5/24/2006 | 5/25/2006 | 5/25/2006 | A | CANC |
Mike Jordan
|
|
|
look at the washer boxes thanks Internet Inspection Request from: paul thornton
|
BLD-Framing/Rough-in | 5/23/2006 | 5/23/2006 | 5/23/2006 | P | FAIL |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Installed washer boxes are not rated in 1hr wall. Complete all fire caulking. Install straps at cut plates.
|
BLD-Framing/Rough-in | 5/23/2006 | 5/23/2006 | 5/23/2006 | A | CANC |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. rescheduled for this afternoon.
|
BLD-Wall cover | 4/16/2006 | 4/17/2006 | 4/17/2006 | A | PART |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Shear nailing on exterior walls.
|
BLD-Footing | 3/19/2006 | 3/20/2006 | 3/20/2006 | A | PASS |
Mike Jordan
|
|
|
interior footing and rebar lookie Internet Inspection Request from: paul thornton
|
BLD-Energy code compliance | 3/10/2006 | 3/13/2006 | 3/13/2006 | A | PASS |
Mike Jordan
|
|
|
rigid insulation at stem wall Internet Inspection Request from: paul thornton
|
BLD-Foundation | 3/7/2006 | 3/8/2006 | 3/8/2006 | A | PART |
Mike Jordan
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Foundation | 3/6/2006 | 3/7/2006 | 3/7/2006 | A | NR |
Mike Jordan
|
|
|
matt Note: stem wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 3/3/2006 | 3/6/2006 | 3/6/2006 | A | PART |
Mike Jordan
|
|
|
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All vertical steel not yet tied into place. Contacted contractor to make sure that all steel is tied.
|
BLD-Footing | 3/2/2006 | 3/3/2006 | 3/3/2006 | P | CANC |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|