Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-02406
StatusFinaled
Name CORY SWAIN
Site Address 8932 8938 W CANDLESTON CT
Project NameNEWCASTLE HEIGHTS 4Plex
Customer Number 
ePlanReviewNo
Description
Lot 14 * To construct a new 4,400 sq. ft. two story, four unit apartment building, each unit has a separate entry and is two stories. The Type "A" unit is 3 bedroom and has two full bathrooms @ 1,159 sq. ft. the Type "B" unit is two bedroom and has two full bathrooms @ 1,041 sq. ft. All construction per the approved plans and attached comment list. MJP DRH 04-00289 CUP 04-00106.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Code Occupancy Approval11/5/200711/5/200711/5/2007PPASS
DetailsScott M.Brown
OK FOR FINAL THIS BUILDING ONLY NOT SUBDIVISION
BLD-Final8/27/20068/28/20068/28/2006APART
DetailsMike Jordan
Internet Inspection Request from: paul thornton. Temp occ given. Will be ok for perm occ once code enforcement has finaled.
FIRE-Final Inspection8/23/20068/24/20068/24/2006APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Aging Inspection8/10/20068/10/20068/10/2006 PASS
DetailsMike Jordan
wip
BLD-Energy code compliance5/30/20065/31/20065/31/2006APASS
DetailsMike Jordan
Internet Inspection Request from: paul thornton. All framing issues have been resolved.
BLD-Other5/24/20065/25/20065/25/2006ACANC
DetailsMike Jordan
look at the washer boxes thanks Internet Inspection Request from: paul thornton
BLD-Framing/Rough-in5/23/20065/23/20065/23/2006PFAIL
DetailsMike Jordan
Internet Inspection Request from: paul thornton. Installed washer boxes are not rated in 1hr wall. Complete all fire caulking. Install straps at cut plates.
BLD-Framing/Rough-in5/23/20065/23/20065/23/2006ACANC
DetailsMike Jordan
Internet Inspection Request from: paul thornton. rescheduled for this afternoon.
BLD-Wall cover4/16/20064/17/20064/17/2006APART
DetailsMike Jordan
Internet Inspection Request from: paul thornton. Shear nailing on exterior walls.
BLD-Footing3/19/20063/20/20063/20/2006APASS
DetailsMike Jordan
interior footing and rebar lookie Internet Inspection Request from: paul thornton
BLD-Energy code compliance3/10/20063/13/20063/13/2006APASS
DetailsMike Jordan
rigid insulation at stem wall Internet Inspection Request from: paul thornton
BLD-Foundation3/7/20063/8/20063/8/2006APART
DetailsMike Jordan
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Foundation3/6/20063/7/20063/7/2006ANR
DetailsMike Jordan
matt Note: stem wall; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing3/3/20063/6/20063/6/2006APART
DetailsMike Jordan
Matt; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. All vertical steel not yet tied into place. Contacted contractor to make sure that all steel is tied.
BLD-Footing3/2/20063/3/20063/3/2006PCANC
DetailsMike Jordan
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa