Code Occupancy Approval | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL THIS BUILDING ONLY NOT SUBDIVISION
|
BLD-Final | 8/30/2006 | 8/30/2006 | 8/30/2006 | A | PASS |
Mike Jordan
|
|
|
Will be ok for perm occ once code enforcement finals.
|
BLD-Final | 8/11/2006 | 8/11/2006 | 8/11/2006 | P | NR |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Needs code enforcement final.
|
FIRE-Final Inspection | 7/28/2006 | 7/28/2006 | 7/28/2006 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed.
|
BLD-Energy code compliance | 4/17/2006 | 4/18/2006 | 4/18/2006 | A | PASS |
Jim Sly
|
|
|
Internet Inspection Request from: paul thornton ###-####
|
BLD-Framing/Rough-in | 4/13/2006 | 4/14/2006 | 4/14/2006 | A | PART |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Needs to complete fire caulking and install 3/4 hour glazing in window for fire seperation distance.
|
BLD-Framing/Rough-in | 4/13/2006 | 4/13/2006 | 4/13/2006 | P | NR |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. could not locate plans or truss engineering.
|
BLD-Wall cover | 4/3/2006 | 4/4/2006 | 4/4/2006 | A | PART |
Mike Jordan
|
|
|
wanting to side Internet Inspection Request from: paul thornton. Shear nailing on exterior walls.
|
BLD-Concrete | 3/2/2006 | 3/3/2006 | 3/3/2006 | A | PART |
Mike Jordan
|
|
|
center footings Internet Inspection Request from: Adrian Marriage. Interior footing for bearing wall.
|
BLD-Energy code compliance | 2/22/2006 | 2/23/2006 | 2/23/2006 | A | PASS |
Mike Jordan
|
|
|
ridgid insulation on foundation walls Internet Inspection Request from: Adrian Marriage
|
BLD-Footing | 2/17/2006 | 2/21/2006 | 2/21/2006 | A | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Footing | 2/16/2006 | 2/17/2006 | 2/17/2006 | P | PART |
Mike Jordan
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|