Code Occupancy Approval | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Scott M.Brown
|
|
|
OK FOR FINAL THIS BUILDING ONLY NOT SUBDIVISION
|
BLD-Final | 8/17/2006 | 8/17/2006 | 8/17/2006 | A | PASS |
Tom Arcoraci
|
|
|
Internet Inspection Request from: paul thornton ok when others sign perm occ
|
FIRE-Final Inspection | 7/25/2006 | 7/25/2006 | 7/25/2006 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled.
|
BLD-Other | 7/25/2006 | 7/25/2006 | 7/25/2006 | A | FAIL |
Troy Cobbley
|
|
|
fire life safety please Internet Inspection Request from: paul thornton No drawings and no contact on ste. I left message on a voice mail at the main office.
|
BLD-Energy code compliance | 3/31/2006 | 3/31/2006 | 3/31/2006 | P | PASS |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. All framing issues have been resolved.
|
BLD-Framing/Rough-in | 3/29/2006 | 3/30/2006 | 3/30/2006 | A | PART |
Mike Jordan
|
|
|
Internet Inspection Request from: paul thornton. Needs to complete firestcaulking and repair floorjoist at plumbing penetration.
|
BLD-Wall cover | 3/14/2006 | 3/14/2006 | 3/14/2006 | P | PART |
Mike Jordan
|
|
|
shear inspection Internet Inspection Request from: paul thornton. Shear nailing on exterior walls.
|
BLD-Wall cover | 3/13/2006 | 3/13/2006 | 3/13/2006 | P | FAIL |
Mike Jordan
|
|
|
shear inspection Internet Inspection Request from: paul thornton
|
BLD-Concrete | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | PASS |
Tom Arcoraci
|
|
|
interior footings and vapor barrier. Adrian ###-####, concrete ordered for 11:00, thanks Internet Inspection Request from: Adrian Marriage
|
BLD-Energy code compliance | 2/10/2006 | 2/13/2006 | 2/13/2006 | A | PASS |
Mike Jordan
|
|
|
Adrian; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Footing | 1/31/2006 | 2/1/2006 | 2/1/2006 | P | PART |
Mike Jordan
|
|
|
matt ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. wip.
|