BLD-Final | 4/26/2006 | 4/26/2006 | 4/26/2006 | P | PASS |
Dave Hannah
|
|
|
Please call Alex at ###-####. ok for perm occ
|
FIRE-Final Inspection | 4/26/2006 | 4/26/2006 | 4/26/2006 | P | PASS |
Forrest France
|
|
|
Related permits have been finaled, fire life safety is satisfactory.
|
Permanent Occupancy | | 4/26/2006 | 4/26/2006 | | DONE |
|
|
|
|
BLD-Final | 4/24/2006 | 4/24/2006 | 4/25/2006 | P | NR |
Dave Hannah
|
|
|
Please check with Forrest prior to arrival. This is 1 of 5 to be signed-off later today. Please call Paul if there is a problem. Thanks.
|
FIRE-Final Inspection | 4/24/2006 | 4/24/2006 | 4/24/2006 | P | FAIL |
Forrest France
|
|
|
Pending sprinkler permit final request.
|
BLD-Other | 2/9/2006 | 2/9/2006 | 2/9/2006 | | DONE |
|
|
|
Temp. Occ. Cert. #5315 extended for 90 days per Jenifer until 5-22-06.
|
BLD-Conference | 11/21/2005 | 11/22/2005 | 11/22/2005 | A | PASS |
Dave Hannah
|
|
|
Please call Dennis for morning inspection. Internet Inspection Request from: Alex Monge ok for temp occ needs other trades to sign off perm ok for perm occ after that and shell is cc
|
FIRE-Final Inspection | 11/21/2005 | 11/21/2005 | 11/21/2005 | P | PART |
Forrest France
|
|
|
Life safety is acceptable, final pending shell permit finals, currently on a temp.
|
FIRE-Final Inspection | 11/18/2005 | 11/18/2005 | 11/18/2005 | P | FAIL |
Forrest France
|
|
|
The emergency lights failed to function, need permanent address numbers posted, fire sprinkler c/n needs to be completed.
|
BLD-Final | 11/18/2005 | 11/18/2005 | 11/18/2005 | P | FAIL |
Jim Storey
|
|
|
Internet Inspection Request from: Alex Monge ada protection/clean exit path.
|
BLD-Final | 11/16/2005 | 11/17/2005 | 11/17/2005 | A | NR |
Jim Storey
|
|
|
Internet Inspection Request from: Alex Mongecheck all permits isued before requisting final insp.
|
FIRE-Final Inspection | 11/16/2005 | 11/17/2005 | 11/17/2005 | A | NR |
Forrest France
|
|
|
Need fire sprinkler permit inspected and approved prior to life safety final.
|
BLD-Wall cover | 10/20/2005 | 10/24/2005 | 10/24/2005 | A | PART |
Dave Hannah
|
|
|
Cover-up inspection at Enzler's. Early AM please. Internet Inspection Request from: Alex Monge ok to cover restroom and office walls
|
BLD-Wall cover | 10/20/2005 | 10/21/2005 | 10/24/2005 | A | PART |
Dave Hannah
|
|
|
Cover-up inspection at Enzler's. Early AM please. I mistakenly scheduled you for Monday. Sorry. Internet Inspection Request from: Alex Monge ok to cover tent sep walls
|