BLD-Final | 4/21/2006 | 4/24/2006 | 4/24/2006 | P | PASS |
Mike Jordan
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. ok for perm occ.
|
FIRE-Final Inspection | 4/21/2006 | 4/24/2006 | 4/24/2006 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Permanent Occupancy | | 4/24/2006 | 4/24/2006 | | DONE |
|
|
|
|
BLD-Energy code compliance | 1/25/2006 | 1/25/2006 | 1/25/2006 | P | PASS |
Mike Jordan
|
|
|
Ben -- call 1st before insp for access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Framing/Rough-in | 1/19/2006 | 1/20/2006 | 1/20/2006 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Lateral bracing complete. hangars installed, shear nailing ok.
|
BLD-Framing/Rough-in | 1/17/2006 | 1/17/2006 | 1/17/2006 | P | FAIL |
Mike Jordan
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Complete lateral bracing. Install simpson LS50 hangars as shown on truss engineering. Check spacing of nailing pattern on south shear wall. (4 inches oc) ok to insulate. c/n posted.
|