BLD-Final | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Nick Latina
|
DOC - Permit Finaled | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 6/19/2006 | 6/20/2006 | 6/20/2006 | A | PASS |
Mike Jordan
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley. Allframing issues have been resolved. ok to cover.
|
BLD-Framing/Rough-in | 5/31/2006 | 5/31/2006 | 5/31/2006 | P | FAIL |
Mike Jordan
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Install strap on top plate at lineset penetration. install additional studs at gr4 truss upstairs. ok to insul. c/n posted.
|
BLD-Framing/Rough-in | 5/19/2006 | 5/22/2006 | 5/22/2006 | A | NR |
Mike Jordan
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Needs to pull mech permit and complete mech ri and insp. prior to framing insp.
|
BLD-Framing/Rough-in | 2/28/2006 | 2/28/2006 | 2/28/2006 | P | PASS |
Mike Jordan
|
|
|
Bob -- wall insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Stemwall insp was performed.
|
BLD-Footing | 2/27/2006 | 2/27/2006 | 2/27/2006 | P | PASS |
Mike Jordan
|
|
|
Bob; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
BLD-Footing | 2/23/2006 | 2/24/2006 | 2/24/2006 | A | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/23/2006 at 12:40:20 PM. Contact: ###-####. no plans, no one on site.
|