Code Occupancy Approval | | | 7/26/2006 | | PASS |
|
|
|
|
Code Occupancy Approval Temp | | | 3/30/2006 | | FAIL |
|
|
|
NEEDS TO BOND FOR LANDSCAPE AND DRIVEWAY. TOTAL BOND REQUIRED IS $7,260.
|
BLD-Final | 3/27/2006 | 3/28/2006 | 3/28/2006 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/27/2006 at 12:57:46 PM. Contact: ###-####. final ok pending p&z insp and aproval.
|
BLD-Final | 3/23/2006 | 3/24/2006 | 3/24/2006 | A | NH |
Jim Storey
|
|
|
Steve; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong no access.
|
BLD-Energy code compliance | 2/1/2006 | 2/1/2006 | 2/1/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/1/2006 at 7:44:35 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/1/2006 | 2/1/2006 | 2/1/2006 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/1/2006 at 7:43:57 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/30/2006 | 1/30/2006 | 1/30/2006 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Stephen Renberg. Provide hangars on remaining trusses in garage at 427 side. Truss membrane penetration at 1hr wall not allowed, not as per plan. 5/8 type X gyp is required behind tubs and concealled space. Also provide wall assemblly for correct attachement of type x.
|
BLD-Footing | 10/26/2005 | 10/27/2005 | 10/27/2005 | A | PART |
Mike Jordan
|
|
|
###-#### - steve
|
BLD-Footing | 10/25/2005 | 10/26/2005 | 10/26/2005 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Stephen Renberg
|