BLD-Final | 4/3/2006 | 4/4/2006 | 4/4/2006 | P | PASS |
Tom Arcoraci
|
|
|
Mike -- fire life safety final 4-4 AM and BLD final 4-4 PM; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok for perm
|
FIRE-Final Inspection | 4/3/2006 | 4/4/2006 | 4/4/2006 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled.
|
Permanent Occupancy | | 4/4/2006 | 4/4/2006 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 2/27/2006 | 2/28/2006 | 2/28/2006 | A | PASS |
Tom Arcoraci
|
|
|
ceiling insp --mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 2/3/2006 | 2/6/2006 | 2/6/2006 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/3/2006 at 12:55:38 PM. Contact: ###-####.
|
FIRE-Final Inspection | 1/25/2006 | 1/25/2006 | 1/25/2006 | P | PART |
Troy Cobbley
|
|
|
Life safety passed in the phase one area and is ok to occupy.
|
FIRE-Final Inspection | 1/11/2006 | 1/12/2006 | 1/12/2006 | P | CANC |
Troy Cobbley
|
|
|
Alarm problems. Inspection canceled
|
FIRE-Sprinkler Rough-in | 1/10/2006 | 1/11/2006 | 1/11/2006 | A | DONE |
Troy Cobbley
|
|
|
Roughin has already been passed. Ceiling tile has been installed. This project is being phased. Phase one of the sprinklers are passed. Project can be finaled when the second phase is inspected.
|
BLD-Other | 12/29/2005 | 12/30/2005 | 12/30/2005 | A | PASS |
Tom Arcoraci
|
|
|
ray Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 11/22/2005 | 11/22/2005 | 11/22/2005 | P | PART |
Jim Sly
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa Walls OK to cover...... Talked to Contr about firestopping all penitrations at rated walls...Check when called for grid insp.
|