BLD-Final | 12/19/2005 | 12/20/2005 | 12/20/2005 | A | PASS |
Jim Sly
|
|
|
please call 15 min prior to meet//joe; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa C/C issued
|
DOC - Permit Finaled | 12/20/2005 | 12/20/2005 | 12/20/2005 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 10/31/2005 | 10/31/2005 | 10/31/2005 | P | CANC |
Tony Young
|
|
|
joe-- call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ///cancelled per Joe Levich, scheduled insp on wrong address 10/31/05 LEG 10:04am
|
BLD-Energy code compliance | 10/24/2005 | 10/25/2005 | 10/25/2005 | A | PASS |
Mike Jordan
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Insulation used as fire blocking on south wall. Installed all the way up to rim joist and between floor joists.
|
BLD-Conference | 9/29/2005 | 9/30/2005 | 10/3/2005 | P | PASS |
Dave Hannah
|
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore no fire damage to floor joist or any other structal members
|