Permanent Occupancy | | 1/6/2006 | 1/6/2006 | | DONE |
|
|
|
|
FIRE-Final Inspection | 1/5/2006 | 1/5/2006 | 1/5/2006 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with dave hanneman's permission until the knox box is installed. Address on the outside of the building needs changed
|
Code Occupancy Approval | 1/5/2006 | 1/5/2006 | 1/5/2006 | P | PASS |
Carol Montgomery
|
|
|
Meets compliance with Conditional Use. Final
|
FIRE-Final Inspection | 1/4/2006 | 1/4/2006 | 1/4/2006 | P | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguisher per review comments #2, final fire alarm permit.
|
BLD-Final | 1/3/2006 | 1/3/2006 | 1/3/2006 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/3/2006 at 9:05:46 AM. Contact: ###-####. OK for Perm Occ. ():
|
BLD-Final | 12/28/2005 | 12/30/2005 | 12/30/2005 | A | FAIL |
Jim Sly
|
|
|
Note: please call 1/2 hr prior ###-#### Scheduled by a contractor via Hello! on 12/28/2005 at 4:23:42 PM. Contact: ###-####. C/N Need Cont. Handrail....Non complying stairs at (2) rear exits.
|
BLD-Foundation | 11/14/2005 | 11/15/2005 | 11/15/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/14/2005 at 2:45:40 PM. Contact: ###-####. block and tie ok
|