BLD-Final | 2/15/2006 | 2/15/2006 | 2/16/2006 | P | PASS |
Dave Hannah
|
|
|
Rock; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
DOC - Permit Finaled | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 2/14/2006 | 2/15/2006 | 2/15/2006 | A | PASS |
Forrest France
|
|
|
Fire life safety related inspection passed.
|
BLD-Framing/Rough-in | 1/31/2006 | 2/1/2006 | 2/2/2006 | A | PASS |
Dave Hannah
|
|
|
Rock -- or Daryl at ###-#### -- for ceiling insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong ok to cover
|
BLD-Framing/Rough-in | 1/25/2006 | 1/26/2006 | 1/30/2006 | A | FAIL |
Dave Hannah
|
|
|
ceiling grid insp///rock; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa needs to fire caulk above ceiling
|
BLD-Framing/Rough-in | 1/4/2006 | 1/4/2006 | 1/5/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/4/2006 at 7:07:40 AM. Contact: ###-####.ok to cover walls
|
BLD-Framing/Rough-in | 1/4/2006 | 1/4/2006 | 1/5/2006 | A | DEFR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/4/2006 at 7:07:40 AM. Contact: ###-####.
|