BLD-Aging Inspection | 12/30/2005 | 12/30/2005 | 1/3/2006 | | PASS |
Jim Storey
|
|
|
final ok
|
DOC - Permit Finaled | 1/3/2006 | 1/3/2006 | 1/3/2006 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 10/24/2005 | 10/24/2005 | 10/24/2005 | P | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
BLD-Final | 10/24/2005 | 10/24/2005 | 10/24/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/24/2005 at 9:42:04 AM. Contact: ###-####.
|
BLD-Final | 10/20/2005 | 10/20/2005 | 10/21/2005 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/20/2005 at 11:08:44 AM. Contact: ###-####.
|
FIRE-Final Inspection | 10/20/2005 | 10/20/2005 | 10/20/2005 | P | FAIL |
Forrest France
|
|
|
The door at northeast side needs approved hardware installed, the shell permit must be finaled prior to the TI, shell needs building address and a knox box.
|
FIRE-Alarm Testing | 10/20/2005 | 10/20/2005 | 10/20/2005 | P | FAIL |
Forrest France
|
|
|
The exit door at northeast side needs approved hardware installed, the shell permit must be finaled prior to TI which needs building address numbers and a knox box installed.
|