BLD-Final | 5/1/2007 | 5/2/2007 | 5/2/2007 | A | PASS |
Mike Jordan
|
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Darla Downs. All issues resolved.
|
DOC - Permit Finaled | 5/2/2007 | 5/2/2007 | 5/2/2007 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 4/27/2007 | 4/30/2007 | 4/30/2007 | P | FAIL |
Mike Jordan
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman. Provide insul. cert. Handrail mounted to low. c/n posted.
|
BLD-Energy code compliance | 5/3/2006 | 5/4/2006 | 5/4/2006 | A | PASS |
Mike Jordan
|
|
|
Jim ; Phone #: ###-#### Internet Inspection Request from: Ione Coleman
|
BLD-Framing/Rough-in | 5/3/2006 | 5/4/2006 | 5/4/2006 | A | PASS |
Mike Jordan
|
|
|
Jim - re-inspect - plans are by the fire place blk pvc container; Phone #: ###-#### Internet Inspection Request from: Ione Coleman. All framing issues have been resolved.
|
BLD-Framing/Rough-in | 4/28/2006 | 5/1/2006 | 5/1/2006 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Need approved plasns to complete framing insp. Complete airseal package prior to insulate. Provide header over doorway to upstairs bedroom adjacent to stairway. Scab pieces on B2 truss required on both sides as per supplied engineering.
|
BLD-Footing | 3/10/2006 | 3/10/2006 | 3/10/2006 | P | FAIL |
Mike Jordan
|
|
|
kenneth; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Stemwall already placed when on site.
|
BLD-Footing | 3/8/2006 | 3/8/2006 | 3/8/2006 | P | PART |
Mike Jordan
|
|
|
Kenneth; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. check setbacks. wip.
|