BLD-Final | 5/10/2006 | 5/11/2006 | 5/11/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/10/2006 at 10:05:19 AM. Contact: ###-####. ok for temp occ need to addjust fixtures in mens restroom
|
BLD-Final | 5/10/2006 | 5/10/2006 | 5/10/2006 | P | DEFR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/10/2006 at 10:05:19 AM. Contact: ###-####. out of time rescheduled for tommorrow
|
FIRE-Final Inspection | 5/9/2006 | 5/10/2006 | 5/10/2006 | A | PASS |
Forrest France
|
|
|
Final fire life safety inspection is acceptable, letter of upgrade agreement for the adjacent unoccupied space fire sprinklers verified.
|
FIRE-Final Inspection | 5/4/2006 | 5/5/2006 | 5/5/2006 | A | FAIL |
Troy Cobbley
|
|
|
Provide updated letter as discussed and remove all items stored on the 7th floor as stated in letter that was provided.
|
BLD-Framing/Rough-in | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/4/2006 at 2:46:01 PM. Contact: ###-####. ceiling grid in hallways ok
|
BLD-Final | 12/30/2005 | 1/3/2006 | 1/5/2006 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/30/2005 at 4:56:07 PM. Contact: ###-####.
|
FIRE-Final Inspection | 1/4/2006 | 1/5/2006 | 1/5/2006 | A | PART |
Forrest France
|
|
|
Life safety final pending letter of agreement for the completion of fire sprinkler work in the adjacent unoccupied space, installation of doors at the restrooms, installation of field tile in the exit corridors, need to remove covers at smoke detectors prior to occupancy, remaining TI life safety issues are satisfactory.
|
FIRE-Final Inspection | 12/30/2005 | 1/3/2006 | 1/3/2006 | P | CANC |
Troy Cobbley
|
|
|
No inspection performed. I did speak with Sam with Unico about life safety requirements such as emergency lights to the exit
|
BLD-Framing/Rough-in | 12/29/2005 | 12/29/2005 | 12/30/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/29/2005 at 7:06:26 AM. Contact: ###-####. elevator lobby ok to cover
|
BLD-Framing/Rough-in | 12/28/2005 | 12/28/2005 | 12/28/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/28/2005 at 8:05:21 AM. Contact: ###-####. ceiling grid ok to cover
|
FIRE-Conference | 12/28/2005 | 12/28/2005 | 12/28/2005 | P | DONE |
Forrest France
|
|
|
On site discussion regarding requirements for TI space occupancy on the 7th floor.
|
BLD-Framing/Rough-in | 12/19/2005 | 12/20/2005 | 12/21/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/19/2005 at 5:57:01 PM. Contact: ###-####. rest rooms ok to cover
|
BLD-Framing/Rough-in | 12/7/2005 | 12/8/2005 | 12/8/2005 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/7/2005 at 1:05:33 PM. Contact: ###-####.int walls ok to cover office area and halls
|