Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD05-03058
StatusFinaled
Name UNICO PROPERTIES
Site Address 101 S CAPITOL BLVD Unit: 703
Project NameUS BANK-7TH FLR
Customer Number 
ePlanReviewNo
Description
(VOLT INFORMATION SCIENCES - STE 703 - RESTROOM UPGRADE - LOBBY REMODEL - US BANK BLDG) This building is fire sprinklered because it is a high-rise building. To create a 1,559 square foot office tenant space on the 7th story of an existing high rise building (19 total stories). To upgrade the 7th story core restrooms to be accessible to the disabled. To remodel the 7th story elevator lobby. The floor area of the entire 7th story is about 14,600 square feet. The "core" has a floor area of about 2,670 square feet. Work is to include interior nonbearing walls, suspended ceilings, interior doors, interior windows, and finishes. The fire sprinkler system, fire alarm system, and high-rise life safety systems (and the infrastructure supporting these systems) for the 7th story are required to comply with the provisions of the 2000 IBC. Existing systems shall be upgraded where necessary, including the installation of quick-response fire sprinklers. If not already existing, fire-safing shall be installed at the perimeter of the 7th story between the floor and the spandrel glass. The work shall comply with the approved drawings, the plan review report, and all applicable codes. The fire sprinkler system shall comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/10/20065/11/20065/11/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/10/2006 at 10:05:19 AM. Contact: ###-####. ok for temp occ need to addjust fixtures in mens restroom
BLD-Final5/10/20065/10/20065/10/2006PDEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/10/2006 at 10:05:19 AM. Contact: ###-####. out of time rescheduled for tommorrow
FIRE-Final Inspection5/9/20065/10/20065/10/2006APASS
DetailsForrest France
Final fire life safety inspection is acceptable, letter of upgrade agreement for the adjacent unoccupied space fire sprinklers verified.
FIRE-Final Inspection5/4/20065/5/20065/5/2006AFAIL
DetailsTroy Cobbley
Provide updated letter as discussed and remove all items stored on the 7th floor as stated in letter that was provided.
BLD-Framing/Rough-in1/4/20061/5/20061/5/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/4/2006 at 2:46:01 PM. Contact: ###-####. ceiling grid in hallways ok
BLD-Final12/30/20051/3/20061/5/2006PNR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/30/2005 at 4:56:07 PM. Contact: ###-####.
FIRE-Final Inspection1/4/20061/5/20061/5/2006APART
DetailsForrest France
Life safety final pending letter of agreement for the completion of fire sprinkler work in the adjacent unoccupied space, installation of doors at the restrooms, installation of field tile in the exit corridors, need to remove covers at smoke detectors prior to occupancy, remaining TI life safety issues are satisfactory.
FIRE-Final Inspection12/30/20051/3/20061/3/2006PCANC
DetailsTroy Cobbley
No inspection performed. I did speak with Sam with Unico about life safety requirements such as emergency lights to the exit
BLD-Framing/Rough-in12/29/200512/29/200512/30/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/29/2005 at 7:06:26 AM. Contact: ###-####. elevator lobby ok to cover
BLD-Framing/Rough-in12/28/200512/28/200512/28/2005PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/28/2005 at 8:05:21 AM. Contact: ###-####. ceiling grid ok to cover
FIRE-Conference12/28/200512/28/200512/28/2005PDONE
DetailsForrest France
On site discussion regarding requirements for TI space occupancy on the 7th floor.
BLD-Framing/Rough-in12/19/200512/20/200512/21/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/19/2005 at 5:57:01 PM. Contact: ###-####. rest rooms ok to cover
BLD-Framing/Rough-in12/7/200512/8/200512/8/2005APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/7/2005 at 1:05:33 PM. Contact: ###-####.int walls ok to cover office area and halls