BLD-Final | 3/22/2007 | 3/23/2007 | 3/23/2007 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-####
|
DOC - Permit Finaled | 3/23/2007 | 3/23/2007 | 3/23/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/21/2007 | 3/21/2007 | 3/21/2007 | P | FAIL |
Dave Hannah
|
|
|
A bond for final grading has been posted with Boise City per Terry Records. Phone #: ###-#### needs landings out side of ext doors and fire place final
|
BLD-Grading Inspection | 3/21/2007 | 3/21/2007 | 3/21/2007 | | BOND |
|
|
|
The rough grading and drainage have been completed at the above mentioned address. However, revegetation and a swale for the driveway runoff have not been completed. For this the engineer has recommended a bond of $2,000.00. Upon receipt of this bond the grading and drainage is conditionally approved.
|
BLD-Energy code compliance | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | PASS |
Dave Hannah
|
|
|
gary ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 10/26/2006 | 10/26/2006 | 10/27/2006 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Internet Inspection Request from: Gary Beck
|
BLD-Foundation | 8/1/2006 | 8/1/2006 | 8/1/2006 | P | PASS |
Dave Hannah
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 7/28/2006 | 7/28/2006 | 7/28/2006 | P | PASS |
Dave Hannah
|
|
|
Internet Inspection Request from: Gary Beck
|
BLD-Foundation | 7/7/2006 | 7/10/2006 | 7/10/2006 | P | PART |
Dave Hannah
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles the rest of the basement ok to pour
|
BLD-Foundation | 6/29/2006 | 7/5/2006 | 7/5/2006 | A | PART |
Dave Hannah
|
|
|
FOUNDATION WALL INSP///CLINT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles 80 percent of basement ok to pour will form the rest next week
|
BLD-Footing | 6/23/2006 | 6/26/2006 | 6/26/2006 | P | PART |
Dave Hannah
|
|
|
clent; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley basement and upper garage ftgs ok to pour
|
BLD-Foundation | 5/24/2006 | 5/25/2006 | 5/25/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/24/2006 at 12:01:44 PM. Contact: ###-#### retaining wall poolarea ok to pour
|
BLD-Footing | 5/17/2006 | 5/18/2006 | 5/18/2006 | A | PART |
Dave Hannah
|
|
|
Footing inspection for retaining wall only.; Phone #: ###-#### Internet Inspection Request from: Gary Beck ftg for retaining wall se corner of lot ok to pour
|
BLD-Footing | 5/17/2006 | 5/17/2006 | 5/17/2006 | P | CANC |
Dave Hannah
|
|
|
GARY; Phone #: ###-#### nOTE: EARLY AFTERNOON Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 5/15/2006 | 5/16/2006 | 5/16/2006 | P | CANC |
Dave Hannah
|
|
|
Please schudule footing inspection for approx. 4:00PM. THANK YOU. Internet Inspection Request from: Gary Beck needs terrys hillside sign off
|