Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD05-03121
StatusFinaled
Name BOISE CITY BUILDING COMPANY
Site Address 1160 W EL PELAR DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a four bedroom, three bathroom 3205 sq. ft. single story single family dwelling (1883 sq. ft. main floor/1322 sq. ft. FINISHED BASEMENT) with a attached 816 sq. ft. three car garage, a 460 sq. ft. covered porch off the basement level, a 320 sq. ft. deck off the back of the main floor and a 120 sq. ft. covered front porch. CFH05-00045 per Carl Miller with Planning and Zoning. Per approved plans, engineering and requirement list. This lot is within a hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. (SAM)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/6/200611/6/200611/6/2006PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 11/6/2006 at 11:07:25 AM. Contact: ###-####.
DOC - Permit Finaled11/6/200611/6/200611/6/2006PPASS
DetailsTony Young
c of c issued
BLD-Grading Inspection11/6/200611/6/200611/6/2006 DONE
Final grading and draiange approved
BLD-Final10/31/200611/1/200611/1/2006ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/31/2006 at 3:01:20 PM. Contact: ###-####. needs terrys sign off
BLD-Final10/16/200610/16/200610/16/2006PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 10/16/2006 at 9:26:24 AM. Contact: ###-####.
need zoning and hillside signoffs 1st,,, need fire caulk in garage, seal on front door and crawl access door, insulate crawl door,, not a formal inspection
BLD-Energy code compliance6/15/20066/15/20066/15/2006PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 6/15/2006 at 9:20:25 AM. Contact: ###-####.
BLD-Energy code compliance6/14/20066/14/20066/14/2006PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 6/14/2006 at 6:01:39 AM. Contact: ###-####.
BLD-Framing/Rough-in6/12/20066/12/20066/12/2006PPASS
DetailsTony Young
Scheduled by a contractor via Hello! on 6/12/2006 at 7:08:41 AM. Contact: ###-####.
BLD-Framing/Rough-in6/9/20066/9/20066/9/2006PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 6/9/2006 at 7:13:54 AM. Contact: ###-####.
conf only,, to much to write up
BLD-Foundation3/9/20063/10/20063/10/2006APART
DetailsTony Young
mana; ###-####
house and garage walls
BLD-Foundation3/9/20063/9/20063/9/2006PNR
DetailsTony Young
Mana; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Footing3/7/20063/8/20063/8/2006PPART
DetailsTony Young
Mana; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
BLD-Footing3/6/20063/7/20063/7/2006PNR
DetailsTony Young
Mana; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
needs hillside soils for remainder of footing prior to inspection,, re-call
BLD-Foundation2/13/20062/14/20062/14/2006APART
DetailsTony Young
Mana; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
basement walls and retaining walls ok,, wip
BLD-Footing2/3/20062/3/20062/3/2006PPART
DetailsTony Young
Mana; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
basement ftgs