BLD-Final | 5/1/2006 | 5/2/2006 | 5/2/2006 | P | PASS |
Mike Jordan
|
|
|
please call when on way///brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 5/2/2006 | 5/2/2006 | 5/2/2006 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Energy code compliance | 3/2/2006 | 3/3/2006 | 3/3/2006 | P | PASS |
Mike Jordan
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. All framing issues have been resolved.
|
BLD-Framing/Rough-in | 3/1/2006 | 3/2/2006 | 3/2/2006 | P | FAIL |
Mike Jordan
|
|
|
Brian -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. complete lateral bracing. ok to insul. c/n posted.
|
BLD-Foundation | 1/25/2006 | 1/26/2006 | 1/26/2006 | A | PART |
Mike Jordan
|
|
|
Jared; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Concrete already placed in stemwall when on site.
|
BLD-Footing | 1/23/2006 | 1/23/2006 | 1/23/2006 | P | PASS |
Mike Jordan
|
|
|
Jared -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. New lot lines shot in. setbacks ok.
|
BLD-Footing | 1/18/2006 | 1/19/2006 | 1/19/2006 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/18/2006 at 12:44:00 PM. Contact: ###-####. Contractor could not locate the property pins, only the PL mark on sidewalk. Contractor to have new property line pins shot in.
|
BLD-Footing | 1/17/2006 | 1/18/2006 | 1/18/2006 | A | NR |
Mike Jordan
|
|
|
jerad; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 1/17/2006 | 1/17/2006 | 1/17/2006 | P | CANC |
Mike Jordan
|
|
|
brian Note: around 2:00 pm; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Inspection cancelled from web by: Marsha Smylie
|