Permit NumberBLD05-03127
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 8000 S FEDERAL WAY
Project Name 
Customer NumberC8832
ePlanReviewNo
Description
Micron Building #1 - (C8832) - To sawcut the existing concrete slab floor and excavate for installation of reinforced concrete retaining walls and concrete floor at 3'-6" below the existing concrete floor for a raised floor system. This is a 15 foot wide by 30 foot long area (approximately 450 square feet). . This excavated area is located east of grid line #C between grid lines #3 & #4. The steel structural frame at the second floor above this area is also being modified to raise the floor framing to a height to allow for the clearance of a new piece of equipment. All construction per the approved plans and structural calculations. JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/9/20063/10/20063/10/2006APASS
DetailsJim Storey
Jim, This is one of two inspections I've scheduled for tomorrow. Troy Mechsner; Phone #: ###-#### Internet Inspection Request from: Troy Mechsner
DOC - Permit Finaled3/10/20063/10/20063/10/2006PPASS
DetailsJim Storey
FIRE-Final Inspection3/7/20063/9/20063/9/2006APASS
DetailsTroy Cobbley
Life safety finaled
BLD-Concrete12/30/20051/4/20061/4/2006APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/30/2005 at 9:15:36 AM. Contact: ###-####.sturcral framing ok for cover.
BLD-Concrete12/30/20051/3/20061/3/2006PDEFR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/30/2005 at 9:15:09 AM. Contact: ###-####.
BLD-Concrete12/30/200512/30/20051/3/2006PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/30/2005 at 9:14:47 AM. Contact: ###-####.placed with s/i
BLD-Footing12/21/200512/23/200512/23/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/21/2005 at 10:27:03 AM. Contact: ###-####.with s/i
BLD-Footing12/21/200512/22/200512/22/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/21/2005 at 10:26:31 AM. Contact: ###-####.
BLD-Footing12/16/200512/20/200512/20/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/2005 at 9:15:20 AM. Contact: ###-####.si
BLD-Footing12/19/200512/20/200512/20/2005APASS
DetailsJim Storey
BLD-Footing12/19/200512/20/200512/20/2005ADEFR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/2005 at 9:14:41 AM. Contact: ###-####.
BLD-Footing12/16/200512/19/200512/19/2005ADEFR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/2005 at 9:14:41 AM. Contact: ###-####.to am 12/20
BLD-Footing12/16/200512/16/200512/16/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/2005 at 9:14:02 AM. Contact: ###-####.si sch.for mon.
BLD-Footing12/8/200512/12/200512/12/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/8/2005 at 7:57:56 AM. Contact: ###-####.exavation work in progess.
BLD-Footing12/8/200512/9/200512/9/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/8/2005 at 7:57:05 AM. Contact: ###-####.exavation in progess.
BLD-Footing12/2/200512/7/200512/7/2005ANR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/2/2005 at 12:15:22 PM. Contact: ###-####.
BLD-Footing12/2/200512/5/200512/5/2005PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/2/2005 at 12:14:43 PM. Contact: ###-####.